CONCRETE PLACEMENT
We manage the full chain, from mix design to final report.
The Work Starts Before the Pour
The quality of a placement is determined well before the truck arrives. Mix design, plant setup, crew briefing and site-specific risk assessment all happen before work begins. By the time a pour starts, there are no open questions.
Our in-house technical concrete team develops mix specifications for each project environment and works directly with suppliers to lock in material quality and programme reliability. That is the part most concrete subcontractors leave to someone else, and it is the part that fails first.
OUR METHOD
MIX DESIGN
The mix is developed for the element, the finish and the season; it is not accepted as delivered. Slump, aggregate, admixture and strength gain are all matched to the job in front of us. A mix that performs in April behaves differently in January, and the difference shows up in the finish.
SEQUENCING & PLANNING
THE POUR
FINISH
TOLERANCES
CURING
documentation
THE PLANT BEHIND IT
We own the equipment that makes the method possible, which means the programme is ours to control rather than something we hire in and hope for.
- 11 Concrete pumps, booms, lines, and trailers.
- 13 Tower and spider booms.
- 8 Somero laser screeds and Line Dragons.
- 30 Ride-on trowel machines.
- 40 Walk-behind trowel machines.
Tower booms, spider booms on jump form and all-electric pumps let us reach the upper levels of a tower or hold a rate across a 50,000 m² floor. Both are placement problems. They need different answers.
WHEN SOMETHING
GOES WRONG
Concrete is a live product, and occasionally a pour does not go to plan. What separates contractors is what happens next.
Progress, issues, variations and programme impacts are flagged as they arise, not at the end of a week when the options have narrowed. Our clients should never have to follow up to find out where a job stands.