WHAT IT LOOKS LIKE
IN PRACTICE
At Qube Warehouse 5 in Moorebank, Qanstruct appointed us to the full package: supply, pump, place and finish, reinforcement supply and fix, detailed excavation, Bondek to the offices and all associated formwork, with the FRP scope on top.
Across 48,000 square metres the floor measured FF 109.9 and FL 112.5, a combined 222.4 against a world record of 153 that had stood since 2007. Two world records, and a Golden Trowel for high tolerance flat floors.
Nobody coordinates that result across three separate contractors.